Browser-side CBM Estimate · No Tariff, Fit or Acceptance Confirmed
CBMCALCULATORMULTI-ITEM WORKPAD
OPEN SHEET02Units
BMEN
02 / UNITS & MEASUREMENT

Convert each length before you cube the result.

Choose the unit used on your tape or rule. The worksheet converts length, width and height separately to metres, then multiplies those converted values. It never treats a centimetre as though its factor applies only once to a cubic result.

Manual calliper measuring the outer edges of a small packed item
02MEASUREMENT NOTE

Five input units, one metre-based calculation.

Choose the unit used on your tape or rule. The worksheet converts length, width and height separately to metres, then multiplies those converted values. It never treats a centimetre as though its factor applies only once to a cubic result.

01

Millimetres

Multiply every linear value by 0.001.

02

Centimetres

Multiply every linear value by 0.01.

03

Metres

Use the entered value unchanged.

04

Inches

Multiply every linear value by exactly 0.0254.

05

Feet

Multiply every linear value by exactly 0.3048.

100 cm × 0.01 = 1 m
1 cm³ = (0.01 m)³ = 0.000001 m³
1 m³ ≈ 35.31 ft³
Centimetre tape aligned with the full outer carton edge
06FIELD VIEW
06 / WORKPAD NOTE

Start at the same outer boundary

Align the zero point with one packed edge and read the furthest outer edge. Include fixed packaging and protectors.

Worker checking the outer span of a wrapped pallet
07FIELD VIEW
07 / WORKPAD NOTE

A metre span is still a linear input

Long pallets and crates use the same three-dimensional formula. The measuring tool changes; the arithmetic does not.

Compact parcel measured with an inch rule
08FIELD VIEW
08 / WORKPAD NOTE

Imperial inputs are converted line by line

Inches and feet are accepted for convenience. Their exact linear factors are applied before multiplication, so mixed-unit rows can still share a metre-cubed total.

Wooden crate beside an opened folding rule
09FIELD VIEW
09 / WORKPAD NOTE

Keep the physical reference with the note

When working in feet, write down which outer points the span covered. A number without its boundary is hard to verify later.

Next: decide how many package rows you needOpen next sheet →